GROUND PROTECTION MATS CHECKLIST: 5 THINGS TO CHECK BEFORE YOU BUY

Featured image for ground protection mats checklist: stacks of grey ground protection mats on a yard

INTRODUCTION

Ground protection mats are there to do a simple job. Protect the surface, keep vehicles and people moving safely, and stop access routes turning into a churned up mess that costs you time and money.

Most failures aren’t complicated. They come from the same handful of mistakes: guessing the ground, guessing the traffic, and choosing a panel based on price, without thinking through how it will be installed, connected, and used.

Here’s the checklist I run through with my clients before they spend money on matting.

1) Buy, rent, or rehire: what’s the job?

Before you start looking at mat types, get clear on what you’re actually buying for.

  • How long is the job / contract?
  • Is it for your own use, or for stock / rehire?

If mats are going out on rehire or rental, assume they’ll have a harder life. They will get dragged about, shifted, and driven over without much sympathy. In that situation, the cheapest system is often the first one that will break. A better approach is to choose a mat that is designed for repeated handling, with a robust connector system, good impact resistance, and a plan for wear items like corners and connectors.

And if it’s for a single job, it’s also worth asking about finance, and whether a buyback is available afterwards.

2) Ground conditions: don’t guess—inspect the site

My first question is usually: can I visit? Because an answer of “it’s fine ground”, over the phone, can mean anything.

On a proper look, you can spot the things that change the spec:

  • soft spots, wet areas, poor drainage
  • ground that’s been dug up and backfilled
  • services crossing the route (pipes/ducts) and whether the backfill is sound
  • obstructions and uneven terrain (including landfill-type ground)
  • access restrictions (width, height, gates, tight turns)
  • gradients

A common mistake is to underestimate very soft ground. If it is that soft, the best answer is not always “use a thicker mat”. Often, what you need is more footprint, so the load is spread over a larger area. In practice, this might mean specifying a wider roadway, and in some cases, double skinning the surface (laying two layers on top of one another) to reduce the pressure on what is underneath.

3) Movements and traffic flow (not just weight)

Gross vehicle weight is only part of the story.

If you have 30 to 40 movements a day, repeated loading and vibration can put the whole system under stress. This is when weaknesses show up first: panels flexing, edges chipping, connectors loosening, and joints starting to open up. Whatever system you choose needs to hold its shape, stay tightly connected, and be straightforward to inspect and tighten as it is used.

You also need to confirm whether there will be two way traffic. This increases the number of passes, wear at the joints, and the chance of panels creeping or shifting if the layout and connections are not robust enough.

4) Tyres vs tracks: specify the traffic type

Be clear on what’s travelling over the mats:

  • standard tyre vehicles
  • rubber tracked machines
  • steel tracked machines

Tracked plant can be much harder on matting and connectors than tyres. If you miss this detail, it’s easy to under spec.

5) Installation and stability: connectors, corners, ramp edges

This is where most of the real-world problems show up. You should aim to do the following:

Connect the mats (don’t loose-lay and hope)

Loose panels move, separate, and create trip hazards. A connected system should:

  • lock connectors into place, so you know the panels are properly engaged
  • ideally have a visual indicator so you can see which connectors are connected and which have worked loose or been undone

On jobs with high levels of traffic, connectors should be checked regularly.

Allow for corners and turning areas

Vehicles don’t do tight 90° turns on narrow matting. Corners and bends need to be bulked out so vehicles aren’t dragging and twisting panels.

Use ramp edges where needed

Adding ramp edges where needed helps prevent trips and vehicle damage, and reduces damage to the panel edges.

Keep speeds down

A simple rule of thumb is to keep site traffic under ~5 mph. Faster than that and panels can lift, creating a bow wave effect that can break connectors and cause vehicle damage.

Think about handling and logistics upfront

A practical question people miss: how are you going to unload and install these?

Some systems require mechanical lifting devices (gantries, chains, clamps). Others can be placed with forklifts, or installed by hand if the panel weight and design allows. Either way, it’s worth planning the handling method before the lorry arrives.

Plan for access points

If there are manholes or services that may need access, it’s worth considering whether the layout can allow for removing small sections without dismantling the whole run.

A quick story from site (why this matters)

I’ll give you a real example, because this is exactly how these jobs tend to go wrong.

I was working with a contractor on a solar farm installation in Cardiff. It was a large site, with constant deliveries, materials storage, and vehicles moving throughout the day.

They decided they did not want the matting installed for them, so they bought the mats and laid them themselves.

Not long after, I started getting complaints. The mats were moving, they were not holding up under use, and the system was starting to cause problems for vehicles coming onto site.

Once I looked at the access route properly, the reasons were obvious:

  • The access was on a steep gradient, steeper than you would normally rely on loose laid panels for
  • The mats were not connected together across the site
  • The ground was an old landfill type ground, soft and unpredictable
  • The product they chose was simply the wrong mat for the job. A heavier mat and a site survey had been recommended.

In their case, the fix was straightforward: do a proper site survey, move to the right specification with a heavier mat, and have the system installed and connected properly for the ground conditions and the gradient.

LET’S DISCUSS YOUR PROJECT

What I need from you to quote quickly

To price your matting properly, I don’t need a detailed report. I just need a few key details so we can avoid assumptions.

Start with:

  • How many square metres you need (or the length and width of the access route)

Then add the details that would change the spec:

  • Ground type/condition (especially if it’s soft, wet, recently backfilled, or disturbed)
  • Any gradients (even short steep sections)
  • Traffic type (tyres vs rubber tracks vs steel tracks)
  • Expected movements per day (rough numbers are fine)
  • Any access restrictions (width/height limits, tight turns, gates)

For many jobs, I often recommend the Preco‑TracK system, a UK manufactured ground protection matting system made by Preconomy. That said, once I understand your site and how the route will be used, I’ll recommend the right system for your requirements